West Camden
Benton County, Tennessee · EIA plant ID 57409 · Operator: WM Renewable Energy LLC
Nameplate5MWSummer 5 MW
Generators3in service
Net generation34GWh12 mo to Dec 2025
Capacity factor80%other units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 31.6 | 89.7% | — |
| 2013 | 37.9 | 90.2% | — |
| 2014 | 37.4 | 89.0% | — |
| 2015 | 37.2 | 88.4% | — |
| 2016 | 39.1 | 92.8% | — |
| 2017 | 38.7 | 92.0% | — |
| 2018 | 36 | 85.5% | — |
| 2019 | 36.9 | 87.8% | — |
| 2020 | 36.3 | 86.2% | — |
| 2021 | 36.5 | 86.8% | — |
| 2022 | 36 | 85.6% | — |
| 2023 | 39 | 92.7% | — |
| 2024 | 38.1 | 90.3% | — |
| 2025 | 33.6 | 80.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 1.6 | 1.6 | Mar 2012 | Operating | — | coming soon |
| GEN2 | Landfill Gas | IC | 1.6 | 1.6 | Mar 2012 | Operating | — | coming soon |
| GEN3 | Landfill Gas | IC | 1.6 | 1.6 | Mar 2012 | Operating | — | coming soon |
Owner / operator
Operator: WM Renewable Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| WM Renewable Energy LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Johnsonville | 1,676 MW | 14.4 km |
| SR Benton | 3 MW | 19.8 km |
| SR Lexington | 7 MW | 42.7 km |
| SR Trezevant | 7 MW | 43.4 km |
| SR Puryear | — | 45.9 km |
| SR Paris | 7 MW | 46.2 km |