CityCenter Central Plant Cogen Units
Clark County, Nevada · EIA plant ID 57348 · Operator: CityCenter Land LLC
Nameplate9MWSummer 8 MW
Generators2in service
Net generation62GWh12 mo to Aug 2026
Capacity factor88%gas/coal/oil units, summer MW
Heat rate4,549Btu/kWhfossil units, electric fuel, HHV
First online2009Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 62.2 | 88.7% | 9,824 |
| 2011 | 59.9 | 85.5% | 10,415 |
| 2012 | 60.1 | 85.6% | 11,505 |
| 2013 | 66.7 | 95.2% | 11,460 |
| 2014 | 64.3 | 91.7% | 11,064 |
| 2015 | 69.2 | 98.8% | 11,103 |
| 2016 | 65.4 | 93.1% | 4,549 |
| 2017 | 60.4 | 86.2% | 4,549 |
| 2018 | 62.3 | 88.8% | 4,558 |
| 2019 | 63.1 | 90.1% | 4,558 |
| 2020 | 60.6 | 86.3% | 4,558 |
| 2021 | 62 | 88.5% | 4,549 |
| 2022 | 61.7 | 88.1% | 4,571 |
| 2023 | 64.6 | 92.1% | 4,549 |
| 2024 | 62.2 | 88.5% | 4,549 |
| 2025 | 61.2 | 87.3% | 4,549 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| UNITA | Natural Gas Fired Combustion Turbine | GT | 4.3 | 4 | Dec 2009 | Operating | — | coming soon |
| UNITB | Natural Gas Fired Combustion Turbine | GT | 4.3 | 4 | Dec 2009 | Operating | — | coming soon |
Owner / operator
Operator: CityCenter Land LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| CityCenter Land LLC | 100.0% | 9 MW |
Nearby plants
Within 80 km.
| Solar Las Vegas MB-1 | 5 MW | 1.7 km |
| Solar Las Vegas MB 2, LLC | 2 MW | 1.9 km |
| Dignity - San Martin | 2 MW | 9.8 km |
| IKEA Las Vegas 462 | 1 MW | 9.9 km |
| Clark (NVE) | 1,376 MW | 11.7 km |
| Speedway North Bldg 1-sllas701 | 1 MW | 12.1 km |