← Back to map

Luke Solar

Maricopa County, Arizona · EIA plant ID 57324 · Operator: Arizona Public Service Co
SolarSolar PhotovoltaicBA: AZPS
Nameplate11MWSummer 11 MW
Generators1in service
Net generation27GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202627.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201930.827.5%—
202032.328.7%—
202130.827.4%—
202232.829.2%—
202332.833.4%—
202432.232.7%—
202527.427.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV11.211.2Jun 2015Operating—coming soon

Owner / operator

Operator: Arizona Public Service Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arizona Public Service Co100.0%11 MW

Nearby plants

Within 80 km.
Amazon Goodyear2 MW5.9 km
White Tank Energy Storage—6.5 km
El Sol BESS50 MW8.3 km
Pluto Energy Storage75 MW13.3 km
Macys Goodyear3 MW13.4 km
Estrella Mountain PV2 MW13.4 km