← Back to map

Metro Support Services Center Solar

Los Angeles County, California · EIA plant ID 57313 · Operator: Metropolitan Transportation Authority
SolarSolar PhotovoltaicBA: LDWP
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2005

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2010201220142016201820202022202420260.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201000.0%—
20111.514.0%—
20121.312.6%—
20131.312.6%—
20141.715.9%—
20151.615.6%—
20161.614.9%—
20171.514.0%—
20181.514.2%—
20191.110.4%—
20201.110.7%—
202100.0%—
20221.211.2%—
20230.55.0%—
20240.11.1%—
202500.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.11.1Apr 2005Operating—coming soon

Owner / operator

Operator: Metropolitan Transportation Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Metropolitan Transportation Authority100.0%1 MW

Nearby plants

Within 80 km.
Civic Centerretired1.3 km
Forever 21 Retail, Inc.1 MW3.4 km
2555 E Olympic Bl1 MW3.5 km
Lafayette 2 - Internal Services Dept2 MW4.7 km
Dedeaux1 MW5.1 km
Big Bear6 MW5.8 km