← Back to map

Maclay Solar Project

Los Angeles County, California · EIA plant ID 57308 · Operator: Los Angeles Department of Water & Power
SolarSolar PhotovoltaicBA: LDWP
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201820202022202420265.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20173.725.3%—
20181.26.1%—
20191.26.3%—
20200.94.5%—
202100.0%—
202200.0%—
20230.95.7%—
20241.16.9%—
20250.85.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV21.8Apr 2017Operating—coming soon

Owner / operator

Operator: Los Angeles Department of Water & Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Angeles Department of Water & Power100.0%2 MW

Nearby plants

Within 80 km.
Olive View Medical Center6 MW1.5 km
CFW Solar X LLC - Vaughn2 MW4.7 km
MM Lopez Energy3 MW4.9 km
Foothill9 MW5.8 km
San Fernando6 MW6.1 km
Sunshine Gas Producers23 MW8.3 km