Taloga Wind LLC
Dewey County, Oklahoma · EIA plant ID 57261 · Operator: taloga wind llc
Nameplate130MWSummer 130 MW
Generators1in service
Net generation188GWh12 mo to Dec 2025
Capacity factor17%wind units, summer MW
Heat rate—thermal plants only
First online2011
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 207.5 | 36.1% | — |
| 2012 | 470.2 | 41.2% | — |
| 2013 | 471.7 | 41.4% | — |
| 2014 | 477.6 | 41.9% | — |
| 2015 | 432.3 | 38.0% | — |
| 2016 | 453.8 | 39.7% | — |
| 2017 | 402 | 35.3% | — |
| 2018 | 403.6 | 35.4% | — |
| 2019 | 359.8 | 31.6% | — |
| 2020 | 329 | 28.8% | — |
| 2021 | 216.5 | 19.0% | — |
| 2022 | 249 | 21.9% | — |
| 2023 | 205.6 | 18.1% | — |
| 2024 | 189.1 | 16.6% | — |
| 2025 | 188.2 | 16.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 130 | 130 | Jul 2011 | Operating | — | mitsubishi MWT-95/2.4 |
Owner / operator
Operator: taloga wind llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| taloga wind llc | 100.0% | 130 MW |
Nearby plants
Within 80 km.
| Mammoth Plains | 226 MW | 27 km |
| Mammoth Plains Energy Storage II | — | 27.4 km |
| Mammoth Plains Energy Storage | — | 27.4 km |
| Seiling Wind II | 99 MW | 29.8 km |
| Seiling Wind I | 199 MW | 29.8 km |
| Crossroads Wind Farm | 228 MW | 29.8 km |