← Back to map

Earthmovers LFGTE

Elkhart County, Indiana · EIA plant ID 57250 · Operator: Wabash Valley Power Assn, Inc
OtherLandfill GasPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators6in service
Net generation21GWh12 mo to Dec 2025
Capacity factor50%other units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20102012201420162018202020222024202649.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20106.561.6%—
201132.477.0%—
201237.589.1%—
201337.288.5%—
201437.388.8%—
201538.190.7%—
201637.889.6%—
201731.575.0%—
201838.290.8%—
201935.985.4%—
202029.870.7%—
202121.952.1%—
202223.455.6%—
202325.560.7%—
202422.553.4%—
202520.849.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Landfill GasIC0.80.8Oct 2010Operating—coming soon
2Landfill GasIC0.80.8Oct 2010Operating—coming soon
3Landfill GasIC0.80.8Oct 2010Operating—coming soon
4Landfill GasIC0.80.8Oct 2010Operating—coming soon
5Landfill GasIC0.80.8Oct 2010Operating—coming soon
6Landfill GasIC0.80.8Oct 2010Operating—coming soon

Owner / operator

Operator: Wabash Valley Power Assn, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wabash Valley Power Assn, Inc100.0%5 MW

Nearby plants

Within 80 km.
Elkhart3 MW7.8 km
Green Cow Power4 MW10.4 km
Twin Branch5 MW13.9 km
Twin Branch PV3 MW14.2 km
St. Joseph Solar20 MW16.3 km
Prairie View I & II LFGTE6 MW21.4 km