Renewable Energy Services of Ohio
Erie County, Ohio · EIA plant ID 57249 · Operator: North American -- Erie, LLC
Nameplate2MWSummer 2 MW
Generators2in service
Net generation10GWh12 mo to Dec 2025
Capacity factor47%other units, summer MW
Heat rate—thermal plants only
First online2010
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 8.7 | 82.3% | — |
| 2011 | 11.9 | 84.7% | — |
| 2012 | 12 | 85.3% | — |
| 2013 | 10.2 | 73.0% | — |
| 2014 | 12.6 | 74.6% | — |
| 2015 | 12 | 57.2% | — |
| 2016 | 15.6 | 73.9% | — |
| 2017 | 16.3 | 77.4% | — |
| 2018 | 17.5 | 83.0% | — |
| 2019 | 18.5 | 87.9% | — |
| 2020 | 17.4 | 82.6% | — |
| 2021 | 17.3 | 82.3% | — |
| 2022 | 14.2 | 67.4% | — |
| 2023 | 11.1 | 53.0% | — |
| 2024 | 10.5 | 49.6% | — |
| 2025 | 10 | 47.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 1.6 | 1.6 | Apr 2010 | Operating | — | coming soon |
| GEN2 | Landfill Gas | IC | 0.8 | 0.8 | Aug 2014 | Operating | — | coming soon |
Owner / operator
Operator: North American -- Erie, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| North American -- Erie, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Monroeville RTO BTM | 3 MW | 13.6 km |
| Monroeville Solar | 3 MW | 14.9 km |
| Wheatsborough Solar | 125 MW | 18.7 km |
| Firelands Wind | — | 20.4 km |
| West Lorain | 556 MW | 30 km |
| Clyde Peaking Engine | 10 MW | 30.7 km |