← Back to map

Blue Wing Solar Energy Generation

Bexar County, Texas · EIA plant ID 57197 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate14MWSummer 14 MW
Generators1in service
Net generation20GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20102012201420162018202020222024202616.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20108.241.5%—
201128.624.2%—
201225.221.2%—
201323.720.0%—
201423.119.6%—
20152218.6%—
201623.219.6%—
201722.619.1%—
201821.818.4%—
201921.718.4%—
202020.417.2%—
202119.816.8%—
202221.318.0%—
202317.815.0%—
202419.116.1%—
202519.516.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV13.913.5Nov 2010Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Renewables Services100.0%14 MW

Nearby plants

Within 80 km.
Arthur Von Rosenberg575 MW5.5 km
V H Braunig1,138 MW5.6 km
OCI Alamo Solar I Hybrid41 MW5.6 km
Bexar ESS100 MW6.5 km
SunE CPS2 LLC10 MW6.8 km
SunE CPS1 LLC10 MW6.8 km