Lafayette County, Wisconsin · EIA plant ID 57116 · Operator: Quilt Block Wind Farm LLC
Nameplate98MWSummer 98 MW
Generators1in service
Net generation369GWh12 mo to Aug 2026
Capacity factor43%wind units, summer MW
Heat rate—thermal plants only
First online2017
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 113 | 39.4% | — |
| 2018 | 351.8 | 41.0% | — |
| 2019 | 370.5 | 43.2% | — |
| 2020 | 381.5 | 44.3% | — |
| 2021 | 363.6 | 42.4% | — |
| 2022 | 408.2 | 47.5% | — |
| 2023 | 366.9 | 42.7% | — |
| 2024 | 394.9 | 45.9% | — |
| 2025 | 381.1 | 44.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN 1 | Onshore Wind Turbine | WT | 98 | 98 | Sep 2017 | Operating | — | vestas V110-2.0 |
Owner / operator
Operator: Quilt Block Wind Farm LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Quilt Block Wind Farm LLC | 100.0% | 98 MW |
Nearby plants
Within 80 km.
| Apple Canyon Lake Solar | 1 MW | 27.2 km |
| Agrimony 2 | 2 MW | 30.9 km |
| Agrimony 1 | 2 MW | 31 km |
| Badger Hollow I | 150 MW | 31 km |
| Badger Hollow II | 150 MW | 31 km |
| Argyle | 2 MW | 32.5 km |