CSU East BayRetired
Alameda County, California · EIA plant ID 57042 · Operator: Pacific Gas & Electric Co
×1 MW natural gas retired since 2020 (latest May 2021)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 3.3 | 79.9% | 9,841 |
| 2012 | 11.2 | 91.0% | 8,751 |
| 2013 | 7.8 | 63.4% | 9,553 |
| 2014 | 10 | 81.5% | 8,397 |
| 2015 | 10.2 | 82.9% | 8,646 |
| 2016 | 3.7 | 29.8% | 6,438 |
| 2017 | 4.2 | 34.2% | 6,438 |
| 2018 | 4.8 | 39.1% | 6,438 |
| 2019 | 4.7 | 38.1% | 6,438 |
| 2020 | 5.7 | 46.4% | 6,437 |
| 2021 | 1.3 | 32.4% | 6,438 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Other Natural Gas | FC | 1.4 | 1.4 | Sep 2011 | Retired May 2021 | — | coming soon |
Owner / operator
Operator: Pacific Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| AT&T - Hayward | 1 MW | 3.3 km |
| Russell City Energy Center | 655 MW | 7.1 km |
| City of Hayward WWTP | 3 MW | 7.6 km |
| Union Sanitary District Cogen | 2 MW | 8.2 km |
| Preferred Freezer San Leandro | 2 MW | 10 km |
| KSR028 Merced Fuel Cell | 2 MW | 10.7 km |