Bayonne Energy Center
Hudson County, New Jersey · EIA plant ID 56964 · Operator: Bayonne Energy Center LLC
50 MW under construction (Batteries), first expected Aug 2027 · EIA-860M
Nameplate644MWSummer 614 MW
Generators10in service · 50 MW building
Net generation918GWh12 mo to Aug 2026
Capacity factor17%gas/coal/oil units, summer MW
Heat rate9,879Btu/kWhfossil units, electric fuel, HHV
First online2012Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 495.4 | 20.9% | 9,617 |
| 2013 | 829.4 | 19.7% | 9,948 |
| 2014 | 1,301.6 | 31.0% | 9,760 |
| 2015 | 1,016.5 | 24.2% | 9,670 |
| 2016 | 1,115.7 | 26.8% | 9,780 |
| 2017 | 625.8 | 15.6% | 9,951 |
| 2018 | 772.1 | 16.3% | 10,356 |
| 2019 | 656.7 | 12.8% | 10,370 |
| 2020 | 347.8 | 6.6% | 10,359 |
| 2021 | 595.6 | 11.2% | 10,236 |
| 2022 | 1,161 | 21.8% | 9,892 |
| 2023 | 751.8 | 14.3% | 9,951 |
| 2024 | 590.5 | 11.2% | 10,012 |
| 2025 | 931.7 | 17.8% | 9,833 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo303,297 MMBtu
Last month with liquid burnMay 2026
Switch while operatingYes
Net summer MW on gas600
Net summer MW on oil576
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | GT | 64 | 63.2 | Jun 2012 | Operating | — | coming soon |
| GT10 | Natural Gas Fired Combustion Turbine | GT | 66 | 59.5 | May 2018 | Operating | — | coming soon |
| GT2 | Natural Gas Fired Combustion Turbine | GT | 64 | 59 | Jun 2012 | Operating | — | coming soon |
| GT3 | Natural Gas Fired Combustion Turbine | GT | 64 | 60.1 | Jun 2012 | Operating | — | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 64 | 61.8 | Jun 2012 | Operating | — | coming soon |
| GT5 | Natural Gas Fired Combustion Turbine | GT | 64 | 63.8 | Jun 2012 | Operating | — | coming soon |
| GT6 | Natural Gas Fired Combustion Turbine | GT | 64 | 63.4 | Jun 2012 | Operating | — | coming soon |
| GT7 | Natural Gas Fired Combustion Turbine | GT | 64 | 61.7 | Jun 2012 | Operating | — | coming soon |
| GT8 | Natural Gas Fired Combustion Turbine | GT | 64 | 61.8 | Jun 2012 | Operating | — | coming soon |
| GT9 | Natural Gas Fired Combustion Turbine | GT | 66 | 59.8 | May 2018 | Operating | — | coming soon |
| BESS1 | Batteries | BA | 49.8 | 49.8 | planned Aug 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Bayonne Energy Center LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bayonne Energy Center LLC | 100.0% | 644 MW |
Nearby plants
Within 80 km.
| Bayonne Solar 2 LLC (CSG) | 2 MW | 2 km |
| Bayonne MUA- Leitner-Poma Wind Turbine | 2 MW | 2.2 km |
| Richmond University Medical Center | 3 MW | 2.2 km |
| WEA Texas Bayonne | 2 MW | 2.7 km |
| Port Richmond WWT Solar | 1 MW | 3.3 km |
| Jersey City DWP | 1 MW | 4.2 km |