Notrees Windpower Hybrid

Ector County, Texas · EIA plant ID 56961 · Operator: Duke Energy Renewables Services
WindBatteriesOnshore Wind TurbineERCOTBA: ERCO
Nameplate189MWSummer 189 MW
Generators3in service
Net generation207GWh12 mo to Aug 2026
Capacity factor16%wind units, summer MW
Heat rate—thermal plants only
First online2009

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201020152020202515.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2009274.227.2%—
2010440.233.0%—
201139929.9%—
2012369.127.6%—
2013455.534.1%—
2014467.735.0%—
2015389.729.2%—
2016411.830.8%—
2017422.531.8%—
2018396.829.9%—
2019394.329.7%—
2020388.729.1%—
2021313.923.7%—
2022306.223.1%—
2023257.619.4%—
2024260.519.6%—
2025237.118.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BATTBatteriesBA3636Dec 2012Operating—coming soon
GEOnshore Wind TurbineWT6060Apr 2009Operating—ge 1.5 SLE
VESTAOnshore Wind TurbineWT92.592.5Apr 2009Operating—vestas V82-1.65

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
DEGS Wind 1 LLC99.0%187 MW
TE Notrees LLC1.0%2 MW

Nearby plants

Within 80 km.
Phoebe Solar250 MW17.3 km
Oxy Renewable Energy - Goldsmith17 MW18.4 km
Goldsmith9 MW18.4 km
Non-PLD US-El Paso - BSSAT00410 MW19.7 km
Ector County Energy Center359 MW24.3 km
Swift Air Solar I145 MW28.1 km