CPV Valley Energy Center

Orange County, New York · EIA plant ID 56940 · Operator: CPV Valley LLC
Natural gasNatural Gas Fired Combined CycleNYISOBA: NYIS
Nameplate771MWSummer 654 MW
Generators3in service
Net generation4,639GWh12 mo to Aug 2026
Capacity factor81%gas/coal/oil units, summer MW
Heat rate7,067Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2018202020222024202680.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,9007,0007,1007,200201820202022202420267,067 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20181,351.532.6%7,187
20194,100.369.8%7,015
20204,70180.9%7,019
20214,332.977.2%6,980
20224,830.884.6%7,023
20234,392.374.4%7,026
20245,001.987.6%7,046
20254,725.482.5%7,053

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas654
Net summer MW on oil539
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CTG1Natural Gas Fired Combined CycleCT235175.8May 2018Operating—coming soon
CTG2Natural Gas Fired Combined CycleCT235183.4May 2018Operating—coming soon
STGNatural Gas Fired Combined CycleCA300.5295.1May 2018Operating—coming soon

Owner / operator

Operator: CPV Valley LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CPV Valley LLC100.0%771 MW

Nearby plants

Within 80 km.
Shoemaker42 MW2.4 km
Sacket Lake Rd #1 Community Solar Farm2 MW3.3 km
Sacket Lake Rd #2 Community Solar Farm2 MW3.3 km
Airport Road Solar (CSG)3 MW3.9 km
Jogee Road Solar2 MW5.5 km
FFP - NY Varano10 MW5.6 km