← Back to map

Fairbanks Morse EngineRetired

Rock County, Wisconsin · EIA plant ID 56937 · Operator: Fairbanks Morse Engine
OilMISOBA: MISO

×2 MW oil retired since 2020 (latest Nov 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040MWh20082009201020112012201320142015201620172018201920202021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%20082010201220142016201820202022

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00020082010201220142016201820202022
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200800.2%11,286
200900.2%9,598
201000.1%8,357
201100.2%10,286
201200.0%—
201300.0%—
201400.1%25,000
201500.0%18,000
201600.0%—
201700.0%14,667
20180.10.4%10,035
201900.0%—
202000.0%11,000
202100.1%7,800

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN7Petroleum LiquidsIC3.13.1Aug 1996Retired Sep 2007—coming soon
IPEPetroleum LiquidsIC1.51.5May 1989Retired Nov 2021—coming soon

Owner / operator

Operator: Fairbanks Morse Engine. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Beloit Memorial Hospital Power Plant3 MW3.7 km
Paddock Solar65 MW6.4 km
HQC Rock River Solar Power Gen Station2 MW6.7 km
All World Solar Facility2 MW6.7 km
West Riverside Energy Center728 MW7.1 km
Rock Riverretired7.2 km