FPL Energy Crystal Lake Wind LLC

Hancock County, Iowa · EIA plant ID 56923 · Operator: FPL Energy Crystal Lake Wind LLC
WindOnshore Wind TurbineMISOBA: MISO
Nameplate150MWSummer 150 MW
Generators1in service
Net generation580GWh12 mo to Aug 2026
Capacity factor44%wind units, summer MW
Heat rate—thermal plants only
First online2008

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201020152020202544.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200834.831.2%—
2009424.732.3%—
2010362.627.6%—
2011463.935.3%—
2012477.736.3%—
2013465.235.4%—
2014551.442.0%—
2015512.139.0%—
2016520.339.5%—
2017516.739.3%—
201846035.0%—
2019512.539.0%—
2020577.643.8%—
2021524.539.9%—
2022638.648.6%—
2023568.143.2%—
2024570.143.3%—
2025584.744.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GE15Onshore Wind TurbineWT150150Dec 2008Operating—ge 1.5 S

Owner / operator

Operator: FPL Energy Crystal Lake Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FPL Energy Crystal Lake Wind LLC100.0%150 MW

Nearby plants

Within 80 km.
FPL Energy Crystal Lake Wind II LLC200 MW7.3 km
Winnebago Wind Power Project20 MW12.4 km
Crystal Lake 3 LLC66 MW12.6 km
Forest City Light Plant22 MW16.8 km
Forest City Solar3 MW17.8 km