Noble Bliss Windpark LLC
Wyoming County, New York · EIA plant ID 56620 · Operator: Valcour Operating Services, LLC
Nameplate101MWSummer 101 MW
Generators1in service
Net generation207GWh12 mo to Dec 2025
Capacity factor23%wind units, summer MW
Heat rate—thermal plants only
First online2008
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2008 | 106.9 | 18.1% | — |
| 2009 | 193.8 | 22.0% | — |
| 2010 | 187.6 | 21.3% | — |
| 2011 | 190.9 | 21.7% | — |
| 2012 | 192.6 | 21.8% | — |
| 2013 | 203.5 | 23.1% | — |
| 2014 | 206.6 | 23.5% | — |
| 2015 | 205.3 | 23.3% | — |
| 2016 | 204.4 | 23.2% | — |
| 2017 | 210.4 | 23.9% | — |
| 2018 | 192.7 | 21.9% | — |
| 2019 | 206.4 | 23.4% | — |
| 2020 | 196.3 | 22.2% | — |
| 2021 | 175.5 | 19.9% | — |
| 2022 | 130 | 14.8% | — |
| 2023 | 160.8 | 18.3% | — |
| 2024 | 170.7 | 19.3% | — |
| 2025 | 206.6 | 23.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 100.5 | 100.5 | May 2008 | Operating | — | ge 1.5 SLE |
Owner / operator
Operator: Valcour Operating Services, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Valcour Bliss Windpark, LLC | 100.0% | 101 MW |
Nearby plants
Within 80 km.
| Telegraph Rd #2 Community Solar Farm | 2 MW | 10.6 km |
| Telegraph Rd #1 Community Solar Farm | 4 MW | 10.6 km |
| Route 19 #2 Community Solar Farm | 5 MW | 12.4 km |
| Route 19 #1 Community Solar Farm | 2 MW | 12.6 km |
| Letchworth Solar Project | 1 MW | 13.7 km |
| Podunque Road CSG | 5 MW | 14.6 km |