← Back to map

Galena 2 Geothermal Power Plant

Washoe County, Nevada · EIA plant ID 56540 · Operator: Ormat Nevada Inc
GeothermalGeothermalSolar PhotovoltaicBA: NEVP
Nameplate17MWSummer 12 MW
Generators2in service
Net generation25GWh12 mo to Dec 2025
Capacity factor32%geothermal units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201020152020202531.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200736.955.9%—
200879.398.2%—
200983.2103.3%—
201079.899.0%—
201170.887.8%—
20126782.8%—
201355.969.3%—
201447.358.7%—
201543.554.0%—
201638.647.8%—
201736.745.5%—
201831.239.6%—
20193443.1%—
202032.140.6%—
202135.545.0%—
202236.145.8%—
202338.148.3%—
202436.746.4%—
202525.131.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1GeothermalBT13.59Apr 2007Operating—coming soon
GLSOLSolar PhotovoltaicPV33Jul 2022Operating—coming soon

Owner / operator

Operator: Ormat Nevada Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ormat Nevada Inc100.0%17 MW

Nearby plants

Within 80 km.
Steamboat Hills LP37 MW0.4 km
Richard Burdette Geothermal26 MW2.1 km
Galena 3 Geothermal Power Plant32 MW2.2 km
Steamboat III26 MW2.8 km
Steamboat II26 MW2.9 km
Verdi2 MW16.8 km