Nameplate712MWSummer 640 MW
Generators3in service
Net generation2,043GWh12 mo to Aug 2026
Capacity factor36%gas/coal/oil units, summer MW
Heat rate7,641Btu/kWhfossil units, electric fuel, HHV
First online2010Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 68.2 | 14.3% | 7,812 |
| 2011 | 1,980.5 | 35.3% | 7,149 |
| 2012 | 2,696.9 | 48.0% | 7,057 |
| 2013 | 2,535.5 | 45.2% | 7,140 |
| 2014 | 2,480.8 | 44.3% | 7,177 |
| 2015 | 3,571.8 | 63.7% | 7,165 |
| 2016 | 2,909.4 | 51.7% | 7,168 |
| 2017 | 2,490.6 | 44.4% | 7,329 |
| 2018 | 2,986.3 | 53.3% | 7,240 |
| 2019 | 3,028.4 | 54.0% | 7,191 |
| 2020 | 3,037.7 | 54.0% | 7,212 |
| 2021 | 2,193 | 39.1% | 7,285 |
| 2022 | 2,564.8 | 45.8% | 7,225 |
| 2023 | 2,946.2 | 52.5% | 7,203 |
| 2024 | 2,845.4 | 50.6% | 7,265 |
| 2025 | 2,576.2 | 46.0% | 7,651 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| A | Natural Gas Fired Combined Cycle | CT | 181.5 | 167 | Dec 2010 | Operating | — | coming soon |
| B | Natural Gas Fired Combined Cycle | CT | 181.5 | 167 | Dec 2010 | Operating | — | coming soon |
| C | Natural Gas Fired Combined Cycle | CA | 349.4 | 306 | Dec 2010 | Operating | — | coming soon |
| 1 | — | CT | 181.5 | 167 | planned Aug 2010 | not_current | — | coming soon |
| 2 | — | CT | 181.5 | 167 | planned Aug 2010 | not_current | — | coming soon |
| 3 | — | CA | 349.4 | 306 | planned Aug 2010 | not_current | — | coming soon |
Owner / operator
Operator: Pacific Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Pacific Gas & Electric Co | 100.0% | 712 MW |
Nearby plants
Within 80 km.
| Abel Road Bioenergy | 4 MW | 27.8 km |
| Wadham Energy LP | 29 MW | 32 km |
| Stony Gorge | 5 MW | 33.4 km |
| Enerparc CA2, LLC | 2 MW | 37.9 km |
| Indian Valley Dam Hydro Project | 3 MW | 39.3 km |
| CFF Rice Mill Solar Plant | 4 MW | 40.1 km |