← Back to map

Jonesboro City Water & Light Plant

Craighead County, Arkansas · EIA plant ID 56505 · Operator: City Water and Light Plant
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelSPPBA: MISO
Nameplate224MWSummer 177 MW
Generators5in service
Net generation57GWh12 mo to Dec 2025
Capacity factor4%gas/coal/oil units, summer MW
Heat rate10,703Btu/kWhfossil units, electric fuel, HHV
First online1999Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20102015202020253.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,000201020152020202510,703 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2006464.0%10,470
200739.22.8%10,799
200819.41.3%11,239
200920.61.3%11,601
2010925.9%10,829
2011247.316.0%10,611
2012187.212.0%10,588
20132.90.2%12,726
201425.11.6%11,820
201572.34.7%11,763
201667.74.4%11,249
201751.63.3%11,092
2018503.2%12,046
201927.31.8%10,695
202010.40.7%13,445
202134.12.2%9,835
2022996.4%10,710
202384.75.5%10,712
2024785.0%10,615
202556.63.6%10,703

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo5,984 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas131
Net summer MW on oil131
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SN01Natural Gas Fired Combustion TurbineGT24.520Jul 1999Operating—coming soon
SN02Natural Gas Fired Combustion TurbineGT21.419Jul 1999Operating—coming soon
SN04Natural Gas Fired Combustion TurbineGT60.546May 2000Operating—coming soon
SN06Natural Gas Fired Combustion TurbineGT57.446May 2003Operating—coming soon
SN07Natural Gas Fired Combustion TurbineGT60.546May 2007Operating—coming soon

Owner / operator

Operator: City Water and Light Plant. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City Water and Light Plant100.0%224 MW

Nearby plants

Within 80 km.
Jonesboro CWL Solar Park10 MW13.8 km
Craighead Electric Solar One2 MW16.4 km
Paragould Reciprocating19 MW27.6 km
Paragould Turbine14 MW27.6 km
Paragould Solar Farm2 MW29.1 km
SR Fisher5 MW44.4 km