← Back to map

Mora Drop Hydroelectric Project

Ada County, Idaho · EIA plant ID 56498 · Operator: Riverside Investments LLC
HydroConventional HydroelectricBA: IPCO
Nameplate2MWSummer 1 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor66%hydro units, summer MW
Heat rate—thermal plants only
First online2006

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%201020152020202565.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20061.229.4%—
20073.650.8%—
20084.564.0%—
20094.969.7%—
20104.868.5%—
20114.767.0%—
2012571.8%—
20133.549.3%—
20144.970.1%—
20154.766.4%—
20164.869.0%—
20174.564.4%—
20184.462.2%—
20194.564.8%—
20204.766.5%—
2021456.6%—
20223.853.6%—
20234.361.9%—
20244.360.8%—
20254.665.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY1.70.8Jun 2006Operating—coming soon

Owner / operator

Operator: Riverside Investments LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Riverside Investments LLC100.0%2 MW

Nearby plants

Within 80 km.
Kuna BESS150 MW5.4 km
MC6 Hydro Facility2 MW9.9 km
Happy Valley Battery Storage82 MW10.6 km
ID Solar40 MW11.4 km
Melba BESS2 MW12.1 km
Orchard Ranch Solar20 MW15.2 km