← Back to map

Spindle Hill Energy Center

Weld County, Colorado · EIA plant ID 56445 · Operator: Invenergy Services LLC
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: PSCO
Nameplate420MWSummer 270 MW
Generators2in service
Net generation250GWh12 mo to Aug 2026
Capacity factor11%gas/coal/oil units, summer MW
Heat rate11,424Btu/kWhfossil units, electric fuel, HHV
First online2007Runs as intermediate

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100GWh2008201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201020152020202510.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,75011,00011,25011,500201020152020202511,424 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2007506.531.9%11,100
2008177.77.5%11,512
200994439.9%11,078
2010568.924.1%11,345
2011423.617.9%10,875
2012288.112.2%10,930
2013514.821.8%11,273
201424710.4%11,289
2015184.37.8%10,887
201657.12.4%11,227
2017122.25.2%11,565
2018331.514.0%11,267
2019270.211.4%11,296
2020426.218.0%11,205
202123810.1%11,570
2022322.513.6%11,631
2023252.710.7%11,308
2024472.219.9%11,400
2025705.429.8%11,331

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo42,566 MMBtu
Last month with liquid burnFeb 2026
Switch while operatingNo
Net summer MW on gas270
Net summer MW on oil286
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combustion TurbineGT210135May 2007Operating—coming soon
GEN2Natural Gas Fired Combustion TurbineGT210135May 2007Operating—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invenergy Services LLC100.0%420 MW

Nearby plants

Within 80 km.
Spindle BESS—1.1 km
Fort Lupton101 MW7.8 km
Frederick Battery Storage8 MW8.3 km
I25 Battery Storage4 MW9.3 km
JM Shafer Generating Station397 MW9.7 km
SR Jenkins Ft Lupton13 MW12.1 km