Treasure Coast Energy Center

St. Lucie County, Florida · EIA plant ID 56400 · Operator: Fort Pierce Utilities Authority
Natural gasNatural Gas Fired Combined Cycle⛽ Dual-fuelBA: FMPP
Nameplate411MWSummer 328 MW
Generators2in service
Net generation1,388GWh12 mo to Aug 2026
Capacity factor48%gas/coal/oil units, summer MW
Heat rate7,274Btu/kWhfossil units, electric fuel, HHV
First online2008Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh2008201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%201020152020202548.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0007,2007,40020102015202020257,274 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2008876.446.9%7,351
20091,594.957.3%7,239
20101,753.462.9%7,211
20111,703.461.2%7,052
20121,899.768.0%7,122
20131,797.164.5%7,096
20141,862.866.9%7,081
20151,645.159.1%7,148
20161,774.363.5%7,173
20171,83966.0%7,121
20181,847.966.3%7,166
20191,787.764.2%7,241
20201,876.167.2%7,245
20211,839.166.0%7,257
20221,972.370.8%7,254
20231,789.364.2%7,169
20241,839.365.8%7,308
20251,747.662.7%7,417

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo19,814 MMBtu
Last month with liquid burnApr 2026
Switch while operatingYes
Net summer MW on gas155
Net summer MW on oil155
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 6 h (EIA 6H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1Natural Gas Fired Combined CycleCT219.6168.8May 2008Operating—coming soon
ST1Natural Gas Fired Combined CycleCA191.8159.2May 2008Operating—coming soon
CC1Natural Gas Fired Combined CycleCC318296planned May 2008not_current—coming soon

Owner / operator

Operator: Fort Pierce Utilities Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Municipal Power Agency (FL)100.0%411 MW

Nearby plants

Within 80 km.
St Lucie2,160 MW13.5 km
Interstate Solar Energy Center75 MW14.3 km
Clover FL75 MW17.1 km
Pink Trial Solar Energy Center75 MW18.9 km
Sea Grape75 MW19.9 km
Sundew75 MW21.4 km