Stanton Energy Center

Orange County, Florida · EIA plant ID 564 · Operator: Orlando Utilities Comm
CoalConventional Steam CoalNatural Gas Fired Combined Cycle⛽ Dual-fuelBA: FMPP
Nameplate1,262MWSummer 1,215 MW
Generators4in service
Net generation5,657GWh12 mo to Aug 2026
Capacity factor53%gas/coal/oil units, summer MW
Heat rate9,561Btu/kWhfossil units, electric fuel, HHV
First online1987Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202552.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,0009,50010,00010,500200520102015202020259,561 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20016,394.7——
20026,070.5——
20036,054.376.6%9,762
20045,880.374.2%9,854
20056,253.179.4%10,344
20066,423.181.8%9,948
20076,179.878.7%10,028
20085,859.674.2%10,100
20095,978.875.9%10,182
20106,797.366.6%9,694
20115,749.255.0%9,637
20124,432.442.2%9,823
20135,087.448.1%9,669
20146,075.257.5%9,965
20155,199.449.1%10,001
20165,891.855.7%9,458
20176,239.659.3%9,632
20186,178.758.6%9,700
20196,179.859.8%9,843
20205,788.954.6%9,613
20216,227.257.9%9,640
20225,847.154.6%9,734
20235,275.549.4%9,844
20243,951.836.7%10,404
20255,444.250.9%9,780

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo11,957 MMBtu
Last month with liquid burnJan 2025
Switch while operatingYes
Net summer MW on gas295
Net summer MW on oil295
Time gas → oilup to 6 h (EIA 6H)
Time oil → gasup to 6 h (EIA 6H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional Steam CoalST464.5453.4Jul 1987Operating—coming soon
2Conventional Steam CoalST464.5469.3Jun 1996Operating—coming soon
BNatural Gas Fired Combined CycleCA129.8128Feb 2010Operating—coming soon
B1Natural Gas Fired Combined CycleCT203.2164Feb 2010Operating—coming soon
UNK1Natural Gas Fired Combustion TurbineGT140140planned Jun 2008not_current—coming soon
UNK2Natural Gas Fired Combustion TurbineGT140140planned Jun 2010not_current—coming soon

Owner / operator

Operator: Orlando Utilities Comm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Orlando Utilities Comm78.0%984 MW
Florida Municipal Power Agency (FL)20.3%256 MW
Kissimmee Utility Authority1.8%22 MW

Nearby plants

Within 80 km.
ACE-Stanton A PV4 MW0.7 km
Curtis H Stanton Energy Center688 MW0.7 km
ACE-Stanton PV5 MW1.3 km
RP-Orlando, LLC5 MW1.6 km
Lockheed Martin Solar5 MW7.9 km
Taylor Creek Solar75 MW11.9 km