← Back to map

Elk River Wind

Butler County, Kansas · EIA plant ID 56303 · Operator: Avangrid Renewables Inc
WindOnshore Wind TurbineSPPBA: SWPP
Nameplate150MWSummer 150 MW
Generators1in service
Net generation265GWh12 mo to Dec 2025
Capacity factor20%wind units, summer MW
Heat rate—thermal plants only
First online2005

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202520.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200575.167.3%—
2006526.340.1%—
2007495.137.7%—
2008579.344.0%—
2009560.242.6%—
2010511.238.9%—
2011598.145.5%—
2012572.143.4%—
2013547.541.7%—
2014567.143.2%—
2015509.438.8%—
2016507.738.5%—
2017466.735.5%—
2018450.134.3%—
2019383.829.2%—
2020348.126.4%—
2021298.822.7%—
2022306.523.3%—
2023287.821.9%—
2024294.822.4%—
2025264.820.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT150150Dec 2005Operating—ge 1.5 SLE

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Avangrid Renewables Inc100.0%150 MW

Nearby plants

Within 80 km.
Caney River Wind Project200 MW17.6 km
El Dorado Refinery39 MW37.3 km
Augusta Electric Plant No 221 MW38.4 km
Augusta Electric Plant No 111 MW38.7 km
Prairie Sky Solar Farm1 MW49.9 km
DeGraff Butler Electric1 MW52.7 km