← Back to map

Oasis Wind

Kern County, California · EIA plant ID 56302 · Operator: Terra-Gen Operating Co LLC
WindOnshore Wind TurbineCAISOBA: CISO
Nameplate60MWSummer 60 MW
Generators1in service
Net generation221GWh12 mo to Dec 2025
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2004

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202541.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20040.41.0%—
2005182.434.7%—
2006194.136.9%—
2007208.139.6%—
2008195.537.1%—
2009162.130.9%—
2010137.626.2%—
2011114.821.9%—
2012124.123.5%—
2013139.426.5%—
2014158.530.2%—
2015151.628.8%—
2016178.934.0%—
2017172.432.8%—
2018171.933.3%—
2019148.728.8%—
20208215.8%—
202140.17.6%—
202220939.6%—
2023205.438.9%—
2024238.445.0%—
2025221.141.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT60.360.3Dec 2004Operating—vestas V136-3.6

Owner / operator

Operator: Terra-Gen Operating Co LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terra-Gen Operating Co LLC100.0%60 MW

Nearby plants

Within 80 km.
Oasis Alta14 MW0.2 km
CTV Power Purchase Contract Trust5 MW1.5 km
Voyager Wind I131 MW1.9 km
Oak Creek Energy Systems I35 MW2.4 km
Mojave 16/17/18 BESS77 MW2.4 km
Ridgetop Energy LLC29 MW2.4 km