← Back to map

South Fork

Prince of Wales-Hyder County, Alaska · EIA plant ID 56265 · Operator: Alaska Power and Telephone Co
HydroConventional Hydroelectric
Nameplate2MWSummer 2 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor34%hydro units, summer MW
Heat rate—thermal plants only
First online2005

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202533.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200500.0%—
20065.231.0%—
2007741.8%—
20086.639.3%—
20095.734.3%—
20105.834.6%—
20116.136.7%—
20126.639.6%—
20135.734.3%—
20145.935.3%—
20155.935.4%—
20165.331.9%—
20175.834.6%—
20184.124.9%—
20194.526.9%—
2020635.7%—
20216.237.3%—
20225.231.0%—
20235.432.7%—
20244.828.9%—
20255.633.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY21.9Jul 2005Operating—coming soon

Owner / operator

Operator: Alaska Power and Telephone Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alaska Power and Telephone Co100.0%2 MW

Nearby plants

Within 80 km.
Klawock Power Generation Station3 MW12.3 km
False Island4 MW17.4 km
Black Bear Lake5 MW18.8 km
Craig (AK)3 MW18.8 km
Thorne Bay Plant1 MW26.5 km
Hiilangaay Hydro5 MW44.3 km