Alden Bailey Power PlantRetired

Clatsop County, Oregon · EIA plant ID 56223 · Operator: Clatskanie Peoples Util Dist
Natural gasBA: BPAT

×11 MW natural gas retired since 2020 (latest Nov 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh20052007200920112013201520172019

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%2%20062008201020122014201620182020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,000200620082010201220142016
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20050.60.7%12,051
20061.41.6%12,127
20070.50.6%13,663
200800.0%—
20090.91.1%13,457
20100.91.0%20,331
20110.50.6%—
20120.10.1%—
201300.0%—
20140.20.2%16,615
20150.40.5%14,071
201600.0%—
201700.0%—
201800.0%—
201900.0%—
202000.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LOKINatural Gas Fired Combustion TurbineGT10.99.8Dec 2001Retired Nov 2021—coming soon

Owner / operator

Operator: Clatskanie Peoples Util Dist. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Georgia-Pacific Wauna Mill30 MW0.5 km
Beaver611 MW17.9 km
Port Westward483 MW18.2 km
Port Westward Unit 2226 MW18.2 km
Mint Farm Generating Station319 MW32.5 km
Nippon Dynawave Packaging Longview WA62 MW33.6 km