← Back to map

McIntosh Combined Cycle Facility

Effingham County, Georgia · EIA plant ID 56150 · Operator: Georgia Power Co
Natural gasNatural Gas Fired Combined CycleBA: SOCO
Nameplate1,377MWSummer 1,316 MW
Generators6in service
Net generation7,885GWh12 mo to Aug 2026
Capacity factor68%gas/coal/oil units, summer MW
Heat rate7,031Btu/kWhfossil units, electric fuel, HHV
First online2005Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202568.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,200200520102015202020257,031 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20052,554.542.0%7,283
20065,081.249.0%7,154
20075,523.553.3%7,295
20085,105.849.1%7,093
20097,089.364.4%6,978
20107,699.469.9%6,993
20118,163.874.2%7,031
20127,53468.2%7,034
20137,92071.9%6,985
20147,328.166.6%7,055
20157,595.569.0%7,045
20168,799.276.0%6,996
20178,93177.3%6,964
20189,053.378.4%7,003
20198,434.873.2%7,024
20208,621.474.6%7,007
20218,586.574.5%7,004
20228,637.575.0%7,008
20239,107.279.0%7,004
20248,034.769.5%7,003
20257,857.168.2%7,049

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas726
Net summer MW on oil726
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10STNatural Gas Fired Combined CycleCA281.9295Jun 2005Operating—coming soon
11STNatural Gas Fired Combined CycleCA281.9295Jun 2005Operating—coming soon
C10ANatural Gas Fired Combined CycleCT203.2181.8Jun 2005Operating—coming soon
C10BNatural Gas Fired Combined CycleCT203.2181.8Jun 2005Operating—coming soon
C11ANatural Gas Fired Combined CycleCT203.2181Jun 2005Operating—coming soon
C11BNatural Gas Fired Combined CycleCT203.2181Jun 2005Operating—coming soon
10Natural Gas Fired Combined CycleCC688.3625planned Jun 2005not_current—coming soon
11Natural Gas Fired Combined CycleCC688.3625planned Jun 2005not_current—coming soon

Owner / operator

Operator: Georgia Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Georgia Power Co100.0%1,377 MW

Nearby plants

Within 80 km.
McIntosh Solar10 MW1 km
McIntosh810 MW1.6 km
Savannah River Mill140 MW2.6 km
Jasper1,068 MW5.6 km
Rincon Solar I18 MW11.4 km
Hardeevilleretired11.5 km