CPV Towantic Energy Center

New Haven County, Connecticut · EIA plant ID 56047 · Operator: CPV Towantic, LLC
Natural gasNatural Gas Fired Combined Cycle⛽ Dual-fuelISONEBA: ISNE
Nameplate842MWSummer 744 MW
Generators3in service
Net generation5,641GWh12 mo to Aug 2026
Capacity factor87%gas/coal/oil units, summer MW
Heat rate6,652Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2018202020222024202686.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,5006,6006,7006,800201820202022202420266,652 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20182,948.864.4%6,684
20193,867.856.7%6,790
20205,323.777.1%6,627
20215,553.380.3%6,596
20224,953.173.4%6,614
20235,534.180.2%6,646
20245,581.281.9%6,623
20254,812.573.9%6,693

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo14,624 MMBtu
Last month with liquid burnNov 2025
Switch while operatingYes
Net summer MW on gas795
Net summer MW on oil668
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CTG1Natural Gas Fired Combined CycleCT280.5249.5May 2018Operating—coming soon
CTG2Natural Gas Fired Combined CycleCT280.5234May 2018Operating—coming soon
STGNatural Gas Fired Combined CycleCA280.5260.3May 2018Operating—coming soon

Owner / operator

Operator: CPV Towantic, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CPV Towantic, LLC100.0%842 MW

Nearby plants

Within 80 km.
IBM Southburyretired7.1 km
Waterbury Generation96 MW9.8 km
Brass Mill Center3 MW11.1 km
Stevenson31 MW11.6 km
Kinneytown New Old2 MW12.9 km
Shepaug37 MW14.8 km