← Back to map

FPL Energy Vansycle LLC (OR)

Umatilla County, Oregon · EIA plant ID 55989 · Operator: FPL Energy Vansycle LLC
WindOnshore Wind TurbineBA: BPAT
Nameplate123MWSummer 123 MW
Generators1in service
Net generation225GWh12 mo to Dec 2025
Capacity factor21%wind units, summer MW
Heat rate—thermal plants only
First online2001

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202520.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2002186.425.6%—
2003201.327.6%—
2004266.136.4%—
2005244.133.5%—
2006289.439.7%—
2007288.226.8%—
2008299.827.8%—
2009233.521.7%—
2010261.124.3%—
2011310.928.9%—
2012292.827.1%—
2013269.725.1%—
2014274.425.5%—
2015238.222.1%—
2016284.926.4%—
2017232.621.6%—
2018286.626.6%—
201922420.8%—
2020302.728.1%—
2021124.411.6%—
2022233.921.8%—
2023230.321.4%—
202425723.8%—
2025225.120.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
V-47Onshore Wind TurbineWT122.8122.8Dec 2001Operating—vestas V47-660

Owner / operator

Operator: FPL Energy Vansycle LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FPL Energy Vansycle LLC100.0%123 MW

Nearby plants

Within 80 km.
FPL Energy Vansycle LLC (WA)177 MW9.4 km
Vansycle25 MW14.8 km
Combine Hills I43 MW19.1 km
Eurus Combine Hills Turbine Ranch 266 MW19.1 km
Vansycle II Wind Energy Center102 MW21.5 km
Nine Canyon96 MW23.5 km