Prince Georges County, Maryland · EIA plant ID 55964 · Operator: Prince George's County
Nameplate4MWSummer 3 MW
Generators4in service
Net generation1GWh12 mo to Dec 2025
Capacity factor2%other units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2003
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2003 | 1.9 | 63.7% | — |
| 2004 | 22.7 | 66.1% | — |
| 2006 | 11.8 | 34.5% | — |
| 2007 | 5.4 | 19.3% | — |
| 2008 | 13.6 | 48.5% | — |
| 2009 | 13.6 | 48.5% | 19,446 |
| 2010 | 14.5 | 51.8% | 21,692 |
| 2011 | 13.1 | 46.7% | 23,944 |
| 2012 | 9.6 | 34.2% | — |
| 2013 | 5.8 | 20.6% | — |
| 2014 | 5.6 | 20.0% | — |
| 2015 | 2.8 | 10.2% | — |
| 2016 | 4.5 | 16.1% | — |
| 2017 | 3.1 | 11.1% | — |
| 2018 | 5.3 | 18.8% | — |
| 2019 | 3.9 | 13.9% | — |
| 2020 | 5 | 17.7% | — |
| 2021 | 0.2 | 0.8% | — |
| 2022 | 0 | 0.0% | — |
| 2023 | 0 | 0.0% | — |
| 2024 | 0 | 0.0% | — |
| 2025 | 0.6 | 2.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Landfill Gas | IC | 1 | 0.8 | Dec 2003 | Operating (Out of service, expected back within the year) | — | coming soon |
| 2 | Landfill Gas | IC | 1 | 0.8 | Dec 2003 | Operating (Out of service, expected back within the year) | — | coming soon |
| 3 | Landfill Gas | IC | 1 | 0.8 | Dec 2003 | Operating (Out of service, expected back within the year) | — | coming soon |
| 4 | Landfill Gas | IC | 1 | 0.8 | Dec 2003 | Operating (Out of service, expected back within the year) | — | coming soon |
Owner / operator
Operator: Prince George's County. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Prince George's County | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| MNCPPC Randall Farm | 1 MW | 2.3 km |
| Brown Station Road Plant I | 3 MW | 2.8 km |
| NCBP TEN, LLC | — | 4.6 km |
| NCBP ONE, LLC | — | 4.7 km |
| NCBP Seven | — | 4.9 km |
| NCBP TWELVE, LLC | 1 MW | 5.2 km |