← Back to map

Twin Lake Hills LLC

Lincoln County, Minnesota · EIA plant ID 55568 · Operator: CHI Operations Inc
WindOnshore Wind TurbineMISOBA: MISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2000

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh200120032005200720092011201320152017201920212023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20052010201520202025

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20016.438.2%—
20026.941.3%—
20036.237.2%—
20040.53.2%—
20056.136.6%—
2006636.3%—
20076.539.2%—
20085.935.6%—
20095.935.7%—
20105.533.3%—
20115.331.8%—
20125.834.5%—
20136.237.0%—
20146.840.9%—
20156.538.9%—
20166.538.9%—
20175.935.2%—
20184.828.6%—
20194.325.8%—
20204.728.2%—
20215.331.9%—
20225.432.3%—
20234.828.6%—
20244.828.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TL30Onshore Wind TurbineWT1.91.9Dec 2000Operating—vestas V47-660

Owner / operator

Operator: CHI Operations Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Northern Alternative Energy51.0%1 MW
Enel North America, Inc.49.0%1 MW

Nearby plants

Within 80 km.
Spartan Hills LLC2 MW3.4 km
Hadley Ridge LLC2 MW3.5 km
Soliloquoy Ridge LLC2 MW3.8 km
Florence Hills LLC2 MW4.3 km
Hope Creek LLC2 MW4.8 km
Ruthton Ridge LLC2 MW5.4 km