Pennington County, South Dakota · EIA plant ID 55478 · Operator: Black Hills Power, Inc. d/b/a
Natural gasNatural Gas Fired Combustion TurbineBA: WACM

100 MW under construction (Natural Gas Internal Combustion Engine), first expected Dec 2026 · EIA-860M

Nameplate40MWSummer 34 MW
Generators1in service · 100 MW building
Net generation144GWh12 mo to Dec 2025
Capacity factor49%gas/coal/oil units, summer MW
Heat rate10,946Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as intermediate

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202548.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,00014,0002005201020152020202510,946 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200367.822.8%9,747
200416.45.5%14,907
200517.15.7%11,186
200623.88.0%10,473
200732.110.8%10,539
200824.88.3%10,678
200914.64.9%10,894
20104.71.6%12,916
20113.91.3%11,969
201212.94.3%11,554
20138.42.8%9,597
20142.91.0%14,245
201510.93.6%12,608
201611.73.9%12,344
20178.93.0%11,812
20189.33.1%11,929
201922.37.5%11,327
202035.211.8%11,386
202142.814.4%10,742
202227.79.3%11,300
202338.212.8%11,636
2024115.438.6%11,254
2025144.548.5%10,946

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT4034Mar 2002Operating—coming soon
IC01Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon
IC02Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon
IC03Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon
IC04Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon
IC05Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon
IC06Natural Gas Internal Combustion EngineIC16.616.3planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Black Hills Power, Inc. d/b/a. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Black Hills Power, Inc. d/b/a100.0%40 MW

Nearby plants

Within 80 km.
Ben French110 MW1.4 km
Wild Springs128 MW33.7 km
Spearfish Hydro4 MW63.3 km