Washington County, Ohio · EIA plant ID 55397 · Operator: Dynegy Washington Energy Facility
Nameplate715MWSummer 661 MW
Generators3in service
Net generation5,327GWh12 mo to Aug 2026
Capacity factor92%gas/coal/oil units, summer MW
Heat rate7,315Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2002 | 522.8 | — | — |
| 2003 | 454.9 | 8.7% | 7,659 |
| 2004 | 269 | 5.1% | 7,035 |
| 2005 | 352.8 | 6.7% | 6,646 |
| 2006 | 392.8 | 7.5% | 7,593 |
| 2007 | 672.5 | 12.8% | 7,573 |
| 2008 | 303 | 5.8% | 7,666 |
| 2009 | 1,138.3 | 21.7% | 7,259 |
| 2010 | 1,646.1 | 31.3% | 7,254 |
| 2011 | 2,800.6 | 53.3% | 7,084 |
| 2012 | 4,304.4 | 78.3% | 7,033 |
| 2013 | 4,014.3 | 73.2% | 7,234 |
| 2014 | 4,345.1 | 79.2% | 7,316 |
| 2015 | 4,869.2 | 88.8% | 7,368 |
| 2016 | 4,376.3 | 75.4% | 7,369 |
| 2017 | 4,035 | 69.7% | 7,093 |
| 2018 | 4,649.7 | 80.3% | 7,122 |
| 2019 | 5,060.4 | 87.4% | 7,187 |
| 2020 | 4,943.3 | 85.1% | 7,226 |
| 2021 | 4,821.3 | 83.3% | 7,180 |
| 2022 | 4,984.7 | 86.1% | 7,298 |
| 2023 | 5,241.7 | 90.5% | 7,343 |
| 2024 | 5,169.2 | 89.0% | 7,393 |
| 2025 | 3,508.8 | 60.6% | 7,327 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CT1 | Natural Gas Fired Combined Cycle | CT | 198.9 | 179 | Jun 2002 | Operating | — | coming soon |
| CT2 | Natural Gas Fired Combined Cycle | CT | 198.9 | 179 | Jun 2002 | Operating | — | coming soon |
| ST1 | Natural Gas Fired Combined Cycle | CA | 317.1 | 303 | Jun 2002 | Operating | — | coming soon |
Owner / operator
Operator: Dynegy Washington Energy Facility. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dynegy Washington Energy Facility | 100.0% | 715 MW |
Nearby plants
Within 80 km.
| Waterford Power, LLC | 922 MW | 7.4 km |
| Pleasants Energy LLC | 383 MW | 37.2 km |
| Willow Island Hydroelectric Plant | 44 MW | 38.1 km |
| FirstEnergy Pleasants Power Station | 1,368 MW | 39.1 km |
| Guernsey Power Station | 2,055 MW | 41 km |
| Anadarko | 8 MW | 50.3 km |