Bucks County, Pennsylvania · EIA plant ID 55298 · Operator: Edgewater Generation, LLC
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate1,338MWSummer 1,280 MW
Generators6in service
Net generation9,070GWh12 mo to Aug 2026
Capacity factor81%gas/coal/oil units, summer MW
Heat rate7,071Btu/kWhfossil units, electric fuel, HHV
First online2004Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202580.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0007,2007,400200520102015202020257,071 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20041,406.622.2%7,474
20052,202.521.9%7,312
20062,679.926.6%7,268
20073,642.736.1%7,332
20084,144.339.1%7,247
20096,53161.8%7,141
20105,548.252.4%7,179
20117,214.168.0%7,124
20128,229.977.4%7,155
20137,673.172.3%7,148
20146,995.664.8%7,313
20156,450.357.9%7,163
20168,57976.8%7,179
20177,570.367.9%7,119
20186,866.661.0%7,151
20197,021.462.3%7,080
20207,84869.8%7,095
20217,460.566.5%7,162
20227,693.468.6%7,201
20237,975.171.1%7,127
20247,691.168.4%7,180
20258,534.976.1%7,083

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1ANatural Gas Fired Combined CycleCT198.9191May 2004Operating—coming soon
CT1BNatural Gas Fired Combined CycleCT198.9191May 2004Operating—coming soon
CT2ANatural Gas Fired Combined CycleCT198.9191Jun 2004Operating—coming soon
CT2BNatural Gas Fired Combined CycleCT198.9191Jun 2004Operating—coming soon
ST1Natural Gas Fired Combined CycleCA271.2258May 2004Operating—coming soon
ST2Natural Gas Fired Combined CycleCA271.2258Jun 2004Operating—coming soon
CT1—CT198.9155planned Mar 2004not_current—coming soon
CT2—CT198.9155planned Mar 2004not_current—coming soon
ST2A—CA280.5265planned Jun 2004not_current—coming soon

Owner / operator

Operator: Edgewater Generation, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Edgewater Generation, LLC100.0%1,338 MW

Nearby plants

Within 80 km.
Fairless Hillsretired1.1 km
Pennsburyretired2.5 km
Wheelabrator Falls53 MW2.8 km
MF Mesa Lane LLC3 MW3.1 km
Tullytown2 MW3.4 km
Parkland Landfill Solar8 MW3.4 km