← Back to map

Liberty Electric Power Plant

Delaware County, Pennsylvania · EIA plant ID 55231 · Operator: Liberty Electric Power LLC
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate614MWSummer 562 MW
Generators3in service
Net generation4,108GWh12 mo to Aug 2026
Capacity factor83%gas/coal/oil units, summer MW
Heat rate7,265Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400GWh2002200420062008201020122014201620182020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202583.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0007,2507,5007,750200520102015202020257,265 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20021,292.9——
2003667.516.6%7,547
20041,30528.1%7,414
2005392.48.6%7,857
2006924.220.3%7,391
20071,667.936.5%7,285
20082,274.547.9%7,262
20092,952.662.3%7,236
20103,166.666.8%7,299
20113,095.165.3%7,286
20123,80180.0%7,213
20133,63376.7%7,219
20143,751.779.2%7,273
20154,12387.0%7,277
20164,136.585.4%7,231
20174,140.984.1%7,257
20184,27386.8%7,172
20193,928.979.8%7,171
20203,757.776.1%7,186
20214,176.384.8%7,147
20223,556.372.2%7,234
20233,995.381.2%7,319
20243,900.279.0%7,242
20253,931.979.9%7,306

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GTG1Natural Gas Fired Combined CycleCT186169.1May 2002Operating—coming soon
GTG2Natural Gas Fired Combined CycleCT186169.1May 2002Operating—coming soon
STGNatural Gas Fired Combined CycleCA242223.8May 2002Operating—coming soon
1——186186planned Jan 2002not_current—coming soon
2——186186planned Jan 2002not_current—coming soon
3——180180planned Jan 2002not_current—coming soon

Owner / operator

Operator: Liberty Electric Power LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Liberty Electric Power LLC100.0%614 MW

Nearby plants

Within 80 km.
Eddystone Generating Station862 MW1.2 km
Chester Operations69 MW2.8 km
Chester Generating Station56 MW5.4 km
Covanta Delaware Valley90 MW5.9 km
Paulsboro Refinery79 MW7 km
Bridgeport Disposal Solar Farm1 MW8.3 km