Rockingham County, North Carolina · EIA plant ID 55116 · Operator: Duke Energy Carolinas, LLC
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: DUK
Nameplate978MWSummer 825 MW
Generators5in service
Net generation1,773GWh12 mo to Aug 2026
Capacity factor25%gas/coal/oil units, summer MW
Heat rate11,059Btu/kWhfossil units, electric fuel, HHV
First online2000Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300400GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202524.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00010,50011,00011,5002005201020152020202511,059 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001367.65.3%10,835
20024175.9%10,787
200332.30.5%11,368
200485.61.3%11,109
200559.30.9%10,556
2006164.22.4%11,024
2007340.85.0%10,387
2008176.22.6%11,620
2009116.21.7%11,592
2010436.76.4%11,162
2011416.75.8%11,245
2012715.49.9%11,178
2013295.24.1%11,259
2014244.63.4%11,318
2015806.911.2%10,973
20161,290.517.8%10,907
2017678.29.4%11,070
20182,325.232.2%11,038
2019959.513.3%11,070
2020656.69.1%11,184
2021724.710.0%11,215
20221,439.219.9%11,111
2023795.811.0%11,172
20241,419.619.6%11,159
20251,813.525.1%11,130

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo455,666 MMBtu
Last month with liquid burnFeb 2026
Switch while operatingYes
Net summer MW on gas825
Net summer MW on oil825
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1Natural Gas Fired Combustion TurbineGT195.5165Jun 2000Operating (Standby / backup)—coming soon
CT2Natural Gas Fired Combustion TurbineGT195.5165Jun 2000Operating (Standby / backup)—coming soon
CT3Natural Gas Fired Combustion TurbineGT195.5165Jun 2000Operating (Standby / backup)—coming soon
CT4Natural Gas Fired Combustion TurbineGT195.5165Jun 2000Operating (Standby / backup)—coming soon
CT5Natural Gas Fired Combustion TurbineGT195.5165Jun 2000Operating (Standby / backup)—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Carolinas, LLC100.0%978 MW

Nearby plants

Within 80 km.
Washington Solar5 MW7.2 km
Moore Solar Farm5 MW8.9 km
Moyer Solar5 MW12.2 km
Avalon/Mayo Hydropower1 MW15.2 km
Market Farm5 MW17.7 km
Jacob Solar5 MW19.1 km