Mondelez Global LLC
Winnebago County, Illinois · EIA plant ID 54933 · Operator: Kraft Foods
Nameplate5MWSummer 5 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1995
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 17.6 | 40.1% | 14,935 |
| 2002 | 3.2 | 7.4% | — |
| 2003 | 22.7 | 51.7% | 8,122 |
| 2004 | 20.9 | 47.6% | 6,113 |
| 2005 | 13.7 | 31.3% | 6,113 |
| 2006 | 0.9 | 2.0% | 6,113 |
| 2007 | 2.8 | 6.4% | 5,990 |
| 2008 | 0.8 | 1.8% | 5,991 |
| 2009 | 6 | 13.8% | 5,990 |
| 2010 | 2.9 | 6.5% | 5,991 |
| 2011 | 2 | 4.5% | 5,990 |
| 2012 | 2.1 | 4.8% | 5,990 |
| 2013 | 0.5 | 1.2% | 5,990 |
| 2014 | 1.3 | 3.0% | 5,990 |
| 2015 | 1.2 | 2.7% | 5,989 |
| 2016 | 1.4 | 3.3% | 7,582 |
| 2018 | 15.5 | 35.5% | 7,582 |
| 2019 | 16 | 36.5% | 7,582 |
| 2022 | 26.9 | 61.5% | 7,582 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combustion Turbine | GT | 4.7 | 5 | Feb 1995 | Operating | — | coming soon |
Owner / operator
Operator: Kraft Foods. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Kraft Foods | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| AES Bend Solar I, LLC | 2 MW | 4.5 km |
| AES Bend Solar II, LLC | 2 MW | 4.6 km |
| Rockford Solar | 2 MW | 6.2 km |
| Machesney Park | 2 MW | 7.2 km |
| Rockford Plant 7 | — | 9.3 km |
| Rockford Plant | 2 MW | 9.3 km |