Brooklyn Navy Yard Cogeneration
Kings County, New York · EIA plant ID 54914 · Operator: Brooklyn Navy Yard Cogen PLP
Nameplate322MWSummer 260 MW
Generators4in service
Net generation2,078GWh12 mo to Aug 2026
Capacity factor91%gas/coal/oil units, summer MW
Heat rate5,994Btu/kWhfossil units, electric fuel, HHV
First online1996Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 1,818.6 | — | — |
| 2002 | 1,865.3 | — | — |
| 2003 | 1,715.4 | 85.1% | 8,668 |
| 2004 | 1,811.2 | 89.6% | 6,968 |
| 2005 | 1,777 | 88.2% | 6,968 |
| 2006 | 2,031.7 | 100.8% | 6,968 |
| 2007 | 1,933.5 | 96.0% | 6,968 |
| 2008 | 1,919.9 | 95.0% | 6,777 |
| 2009 | 1,927.7 | 89.8% | 6,759 |
| 2010 | 1,880.8 | 85.9% | 6,759 |
| 2011 | 2,006.3 | 91.6% | 6,759 |
| 2012 | 1,672.2 | 76.1% | 6,759 |
| 2013 | 1,940.1 | 88.6% | 6,759 |
| 2014 | 2,052 | 93.7% | 6,759 |
| 2015 | 1,955.9 | 89.3% | 6,759 |
| 2016 | 2,089 | 95.1% | 5,883 |
| 2017 | 1,965.4 | 89.8% | 5,883 |
| 2018 | 2,041.4 | 93.2% | 5,883 |
| 2019 | 1,892.2 | 86.4% | 5,884 |
| 2020 | 1,937.6 | 88.2% | 5,918 |
| 2021 | 1,990.3 | 90.9% | 5,899 |
| 2022 | 1,965.7 | 89.8% | 5,913 |
| 2023 | 2,021.9 | 88.8% | 5,883 |
| 2024 | 2,169.6 | 95.0% | 6,003 |
| 2025 | 1,916.5 | 84.1% | 5,991 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo921,034 MMBtu
Last month with liquid burnFeb 2026
Switch while operatingYes
Net summer MW on gas193
Net summer MW on oil193
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | CT | 121 | 95 | Mar 1996 | Operating | — | coming soon |
| 2 | Natural Gas Fired Combined Cycle | CT | 121 | 95 | Mar 1996 | Operating | — | coming soon |
| 3 | Natural Gas Fired Combined Cycle | CA | 40 | 35 | Jun 1996 | Operating | — | coming soon |
| 4 | Natural Gas Fired Combined Cycle | CA | 40 | 35 | Jun 1996 | Operating | — | coming soon |
Owner / operator
Operator: Brooklyn Navy Yard Cogen PLP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Axium BNY LLC | 58.4% | 188 MW |
| Mission Energy of NY | 41.6% | 134 MW |
Nearby plants
Within 80 km.
| Hudson Avenue | retired | 0.7 km |
| NISA Electric Generation Project | — | 1 km |
| Brooklyn Hospital Center | 2 MW | 1 km |
| North 1st | 47 MW | 2.1 km |
| NYP-Lower Manhattan Hospital | 2 MW | 2.7 km |
| Oak Orchard | 5 MW | 2.9 km |