CenturyLink Regional HQRetired
Franklin County, North Carolina · EIA plant ID 54882 · Operator: Franklin Charter, LLC
×1 MW oil retired since 2020 (latest Nov 2021)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 0.2 | 1.2% | 6,563 |
| 2002 | 0.1 | 0.8% | 10,644 |
| 2003 | 0.1 | 0.7% | 11,522 |
| 2004 | 0.2 | 1.6% | 8,823 |
| 2005 | 0.2 | 1.7% | 7,933 |
| 2006 | 0.2 | 1.8% | 9,272 |
| 2008 | 0.1 | 0.7% | 15,176 |
| 2009 | 0 | 0.4% | 7,135 |
| 2010 | 0.1 | 0.6% | 6,701 |
| 2011 | 0.1 | 0.7% | 6,400 |
| 2012 | 0 | 0.4% | — |
| 2013 | 0 | 0.0% | — |
| 2014 | 0 | 0.3% | 13,556 |
| 2015 | 0 | 0.0% | — |
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0 | 0.0% | — |
| 2019 | 0 | 0.0% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 0 | 0.0% | — |
| 2022 | 0 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Petroleum Liquids | IC | 1 | 0.6 | Mar 1993 | Retired Oct 2016 | — | coming soon |
| GEN2 | Petroleum Liquids | IC | 1 | 0.6 | Mar 1993 | Retired Nov 2021 | — | coming soon |
Owner / operator
Operator: Franklin Charter, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Walkers Crossroads BESS | 5 MW | 10.6 km |
| Wake RJ3 Solar Energy Storage | 1 MW | 11.1 km |
| Franklinton Solar | 5 MW | 17.3 km |
| South Louisburg Solar | 5 MW | 19.1 km |
| Tides Lane Farm | 4 MW | 20.3 km |
| Cirrus Solar LLC | 5 MW | 23.3 km |