Cook County, Illinois · EIA plant ID 54788 · Operator: Evanston Board of Education
Nameplate2MWSummer 2 MW
Generators3in service
Net generation0GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1992Runs as rarely runs
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 5.2 | 24.7% | 7,883 |
| 2002 | 4.5 | 21.4% | 10,395 |
| 2003 | 5 | 23.9% | 9,275 |
| 2004 | 2.9 | 13.8% | 6,890 |
| 2005 | 0 | 0.0% | — |
| 2006 | 0 | 0.0% | — |
| 2007 | 0 | 0.0% | — |
| 2008 | 0 | 0.0% | — |
| 2009 | 0 | 0.0% | — |
| 2010 | 0 | 0.0% | — |
| 2011 | 0 | 0.0% | — |
| 2012 | 0 | 0.0% | — |
| 2013 | 0 | 0.0% | — |
| 2014 | 0 | 0.0% | — |
| 2015 | 0 | 0.0% | — |
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0 | 0.0% | — |
| 2019 | 0 | 0.0% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 0 | 0.0% | — |
| 2022 | 0 | 0.0% | — |
| 2023 | 0 | 0.0% | — |
| 2024 | 0 | 0.0% | — |
| 2025 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Natural Gas Internal Combustion Engine | IC | 0.8 | 0.8 | Dec 1992 | Operating (Standby / backup) | — | coming soon |
| GEN2 | Natural Gas Internal Combustion Engine | IC | 0.8 | 0.8 | Dec 1992 | Operating (Standby / backup) | — | coming soon |
| GEN3 | Natural Gas Internal Combustion Engine | IC | 0.8 | 0.8 | Dec 1992 | Operating (Standby / backup) | — | coming soon |
Owner / operator
Operator: Evanston Board of Education. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Evanston Board of Education | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Saint Francis Hospital | retired | 2.5 km |
| Northeastern Illinois University Cogen | 3 MW | 7.2 km |
| Winnetka | 33 MW | 8.4 km |
| Lake Gas Recovery | 6 MW | 11.7 km |
| MTHS Co-Gen Buildings | 1 MW | 13.5 km |