Lateral 10 Ventures
Twin Falls County, Idaho · EIA plant ID 54753 · Operator: Lateral 10 Ventures
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor3%hydro units, summer MW
Heat rate—thermal plants only
First online1984
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 6.2 | 30.9% | — |
| 2002 | 61.1 | 305.9% | — |
| 2003 | 58 | 290.6% | — |
| 2005 | 8 | 40.1% | — |
| 2006 | 8.4 | 42.2% | — |
| 2007 | 5.4 | 27.0% | — |
| 2008 | 8.5 | 41.9% | — |
| 2009 | 8.1 | 40.0% | — |
| 2010 | 8.6 | 42.9% | — |
| 2011 | 9.2 | 45.7% | — |
| 2012 | 5.6 | 27.6% | — |
| 2013 | 5.6 | 27.8% | — |
| 2014 | 7.5 | 37.2% | — |
| 2015 | 5.9 | 29.4% | — |
| 2016 | 6.9 | 34.1% | — |
| 2017 | 8.3 | 41.3% | — |
| 2018 | 7.1 | 35.4% | — |
| 2021 | 5 | 24.6% | — |
| 2022 | 4.2 | 20.7% | — |
| 2023 | 3.8 | 18.9% | — |
| 2024 | 1.4 | 7.0% | — |
| 2025 | 0.6 | 2.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | HY | 2.4 | 2.3 | Nov 1984 | Operating | — | coming soon |
Owner / operator
Operator: Lateral 10 Ventures. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Lateral 10 Ventures | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Blind Canyon Hydro | 1 MW | 8 km |
| Salmon Falls Wind Park | 21 MW | 9 km |
| Clear Lake | 3 MW | 9.3 km |
| Thousand Springs | 7 MW | 11.2 km |
| Upper Salmon B | 17 MW | 13.3 km |
| Upper Salmon A | 18 MW | 13.6 km |