Gaylord Container Bogalusa
Washington County, Louisiana · EIA plant ID 54427 · Operator: Temple-Inland Corp
Nameplate100MWSummer 92 MW
Generators3in service
Net generation426GWh12 mo to Aug 2026
Capacity factor50%other units, summer MW
Heat rate4,806Btu/kWhfossil units, electric fuel, HHV
First online1979
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 489.9 | — | 16,128 |
| 2002 | 530.2 | — | 20,562 |
| 2003 | 36 | — | 19,347 |
| 2004 | 495.7 | 54.4% | 13,918 |
| 2005 | 509 | 56.3% | 13,918 |
| 2006 | 530.7 | 60.2% | 13,918 |
| 2007 | 527.4 | 59.3% | 13,918 |
| 2008 | 497.9 | 59.4% | 13,918 |
| 2009 | 443.6 | 48.3% | 13,918 |
| 2010 | 500.7 | 59.7% | 13,918 |
| 2011 | 455.1 | 55.0% | 13,918 |
| 2012 | 434.9 | 52.0% | 13,918 |
| 2013 | 430.4 | 51.9% | 13,918 |
| 2014 | 459.7 | 55.3% | 13,917 |
| 2015 | 481.4 | 57.0% | 13,918 |
| 2016 | 528.6 | 63.2% | 5,004 |
| 2017 | 526.8 | 62.7% | 5,004 |
| 2018 | 511.1 | 59.1% | 5,004 |
| 2019 | 447.3 | 51.3% | 5,004 |
| 2020 | 398.8 | 45.2% | 5,340 |
| 2021 | 380.3 | 43.3% | 5,448 |
| 2022 | 443.5 | 50.5% | 5,004 |
| 2023 | 402.4 | 46.5% | 4,951 |
| 2024 | 412.2 | 47.0% | 5,004 |
| 2025 | 450.2 | 52.2% | 4,806 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| NO10 | Wood/Wood Waste Biomass | ST | 37 | 34.4 | Apr 1999 | Operating | — | coming soon |
| NO8 | Wood/Wood Waste Biomass | ST | 25 | 22.5 | Mar 1981 | Operating | — | coming soon |
| NO9 | Wood/Wood Waste Biomass | ST | 37.5 | 34.9 | Jun 1979 | Operating | — | coming soon |
Owner / operator
Operator: Temple-Inland Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Temple-Inland Corp | 100.0% | 100 MW |
Nearby plants
Within 80 km.
| Washington Parish Energy Center | 400 MW | 5.1 km |
| Bogalusa West Solar Station | — | 6.6 km |
| Iris Solar LLC | 50 MW | 32.3 km |
| Sunlight Road Solar | 50 MW | 34.4 km |
| Moonshot | 79 MW | 51.1 km |
| District 70 Transco Gas Pipe Line | 2 MW | 61.3 km |