Little Wood Hydro Project

Blaine County, Idaho · EIA plant ID 54386 · Operator: Littlewood Irrigation District
HydroConventional HydroelectricBA: IPCO
Nameplate3MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor11%hydro units, summer MW
Heat rate—thermal plants only
First online1985

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202511.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012.29.5%—
200200.0%—
20034.919.9%—
200400.0%—
200500.0%—
200600.0%—
2007314.4%—
20083.818.1%—
20096.229.4%—
20106.229.5%—
20118.741.6%—
20126.531.0%—
20133.114.8%—
20142.19.8%—
20152.310.9%—
20163.918.3%—
20178.238.9%—
20186.530.9%—
20198.239.1%—
20202.612.2%—
20210.10.6%—
20223.918.5%—
20235.727.0%—
20244.822.5%—
20252.411.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY2.82.4Feb 1985Operating (Standby / backup)—coming soon

Owner / operator

Operator: Littlewood Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Littlewood Irrigation District100.0%3 MW

Nearby plants

Within 80 km.
Magic Dam Hydroelectric Project9 MW32.8 km
North Gooding Main Hydro1 MW60.4 km
Notch Butte Hydro1 MW63.2 km
AJMS, LLC1 MW65.1 km
Dietrich Drop5 MW68.4 km
Mile 28 Water Power Project1 MW77 km