← Back to map

Mansfield Mill

De Soto County, Louisiana · EIA plant ID 54091 · Operator: IPC-Mansfield Mill
OtherNatural Gas Fired Combustion TurbineWood/Wood Waste BiomassSPPBA: MISO
Nameplate172MWSummer 117 MW
Generators4in service
Net generation823GWh12 mo to Aug 2026
Capacity factor62%other units, summer MW
Heat rate4,827Btu/kWhfossil units, electric fuel, HHV
First online1981

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202561.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
4,0006,0008,000200520102015202020254,827 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001747.457.0%—
2002768.780.2%—
2003723.882.6%9,340
2004816.584.5%5,749
2005777.383.5%5,843
200678486.5%6,051
200777989.2%6,087
2008755.974.0%5,629
2009721.174.7%5,637
2010775.275.4%5,813
201177580.9%6,120
2012776.176.1%5,966
2013741.268.2%5,941
2014755.172.6%5,947
2015775.178.0%5,972
2016806.173.7%4,827
2017831.275.0%4,827
2018825.171.1%4,827
2019794.266.3%4,827
2020935.571.7%4,827
2021860.766.0%4,827
202288864.8%4,826
2023877.561.7%4,828
2024745.953.0%4,831
2025859.462.3%4,827

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST4024.6Oct 1981Operating—coming soon
GEN2Wood/Wood Waste BiomassST4025.6Dec 1981Operating—coming soon
GEN3Wood/Wood Waste BiomassST3022.1Dec 1981Operating—coming soon
GEN5Natural Gas Fired Combustion TurbineGT6245Jul 2019Operating—coming soon
GEN4Natural Gas Fired Combustion TurbineGT2529.5Aug 1995Retired May 2019—coming soon

Owner / operator

Operator: IPC-Mansfield Mill. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
IPC-Mansfield Mill100.0%172 MW

Nearby plants

Within 80 km.
Dolet Hillsretired14.2 km
ADA Carbon Solutions Red River21 MW23.1 km
Dolet Hills Solar—23.4 km
Arsenal Hill125 MW44.5 km
J Lamar Stall Unit624 MW44.6 km
International Paper Red River Mill79 MW46 km