← Back to map

Broadwater Power Project

Broadwater County, Montana · EIA plant ID 54006 · Operator: Montana Dept-Natural Res&Consv
HydroConventional HydroelectricBA: NWMT
Nameplate10MWSummer 10 MW
Generators1in service
Net generation28GWh12 mo to Dec 2025
Capacity factor33%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202532.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200140.548.1%—
200241.849.7%—
200343.451.6%—
200440.848.4%—
200543.851.5%—
200648.356.9%—
20074552.9%—
200846.154.1%—
200952.962.2%—
201052.862.2%—
201153.563.0%—
201253.562.8%—
201345.153.0%—
201452.161.3%—
201547.355.6%—
201648.356.7%—
201752.962.3%—
201829.734.9%—
20195564.7%—
202052.461.5%—
202121.325.0%—
202239.546.5%—
202339.446.4%—
202447.455.7%—
202527.932.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY9.79.7Jun 1989Operating—coming soon

Owner / operator

Operator: Montana Dept-Natural Res&Consv. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Montana Dept-Natural Res&Consv100.0%10 MW

Nearby plants

Within 80 km.
GCC Trident Solar Project4 MW20.8 km
Canyon Ferry58 MW63.7 km
Madison Dam16 MW72.5 km