Camp Far West

Placer County, California · EIA plant ID 531 · Operator: south sutter water district
HydroConventional HydroelectricCAISOBA: CISO
Nameplate7MWSummer 7 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor23%hydro units, summer MW
Heat rate—thermal plants only
First online1985

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2024GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202522.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013.66.0%—
200226.845.0%—
200330.951.8%—
200421.636.1%—
200526.644.6%—
200634.357.5%—
200711.818.7%—
200811.718.5%—
200922.135.1%—
201027.844.0%—
201138.460.8%—
201222.435.4%—
201312.820.3%—
20145.89.1%—
20155.38.3%—
201627.743.8%—
201740.564.2%—
201825.440.2%—
201929.546.8%—
202012.920.4%—
20211.93.0%—
20226.410.2%—
202322.735.9%—
20247.311.6%—
202514.222.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY7.27.2Feb 1985Operating—coming soon

Owner / operator

Operator: south sutter water district. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
south sutter water district100.0%7 MW

Nearby plants

Within 80 km.
G2 Energy Ostrom Road LLC4 MW7.6 km
Madena 4—9.4 km
San Francisco Bay Coffee1 MW15.8 km
Sierra Pacific Lincoln Facility19 MW16.2 km
Skylight Renewable Energy—18 km
Madena 3—19.8 km