Twin Falls Hydro

King County, Washington · EIA plant ID 50827 · Operator: Central Rivers Power US, LLC
HydroConventional HydroelectricBA: PSEI
Nameplate24MWSummer 23 MW
Generators2in service
Net generation59GWh12 mo to Dec 2025
Capacity factor30%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202529.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200165.532.8%—
200255.327.7%—
200367.934.0%—
20046.53.3%—
200548.424.3%—
200667.333.7%—
200772.936.5%—
200873.436.6%—
200968.434.3%—
201075.838.0%—
201190.345.2%—
201295.747.8%—
201383.641.9%—
201492.646.3%—
201552.626.4%—
201679.839.9%—
201777.838.9%—
201878.339.2%—
201953.226.6%—
202075.537.7%—
202178.639.4%—
202270.335.2%—
20235025.0%—
202462.931.4%—
202559.329.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UNI1Conventional HydroelectricHY1211.4Dec 1989Operating—coming soon
UNI2Conventional HydroelectricHY1211.4Dec 1989Operating—coming soon

Owner / operator

Operator: Central Rivers Power US, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Enel North America, Inc.49.5%12 MW
Central Rivers Power US, LLC49.5%12 MW
South Fork Resources Inc1.0%0 MW

Nearby plants

Within 80 km.
Weeks Falls4 MW3.2 km
Black Creek4 MW6.4 km
Cedar Falls (WA)30 MW7.6 km
Hancock Creek Hydroelectric Project6 MW14.2 km
Snoqualmie13 MW15.4 km
Snoqualmie 239 MW16 km