OtherWood/Wood Waste BiomassPJMBA: PJM
Nameplate48MWSummer 41 MW
Generators1in service
Net generation288GWh12 mo to Aug 2026
Capacity factor67%other units, summer MW
Heat rate12,511Btu/kWhfossil units, electric fuel, HHV
First online1980

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202566.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
05,00010,0002005201020152020202512,511 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001357.776.9%10,500
2002317.967.0%9,996
2003319.164.8%4,580
2004321.873.3%4,472
2005305.768.8%4,472
2006318.670.2%4,472
2007318.470.0%4,472
2008280.854.7%4,887
2009270.453.7%4,920
2010254.747.7%5,020
2011281.261.8%4,782
2012300.168.4%4,760
2013276.462.4%4,767
2014262.157.8%4,971
2015289.964.2%4,701
2016282.660.7%12,654
2017305.570.2%12,480
2018287.563.3%12,539
2019262.155.5%12,772
2020280.957.3%12,541
2021281.959.5%12,552
2022255.958.7%12,329
2023294.165.1%11,832
2024282.860.3%12,378
2025276.561.9%12,540

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST47.640.7Dec 1980Operating—coming soon

Owner / operator

Operator: RockTenn-Hopewell. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RockTenn-Hopewell100.0%48 MW

Nearby plants

Within 80 km.
Hopewell Cogeneration399 MW0.1 km
Hopewell Power Station71 MW0.7 km
Park 500 Philip Morris USA13 MW5.3 km
Sebera Solar18 MW5.4 km
Philip Morris2 MW5.6 km
Chesterfield447 MW13.5 km